Plan-check support
Mixed-Use Shell — Plan-Check Support, Sacramento, CA
Summary
Stepped in mid-permit on a 14,000 sq ft mixed-use shell to clear three rounds of structural corrections. Rewrote the calc package and re-coordinated with the EOR.
Scope of work
Audit
- Existing calcs review
- Correction triage
- Code path decision
Rework
- Updated lateral model
- Diaphragm & collector check
- Revised connection details
Permit
- Plan-check responses
- City coordination
- Final sign-off
Constraints & objectives
Close out three open structural correction items in one cycle
Avoid resubmitting the architectural set
Coordinate cleanly with the original engineer of record
What the client said
“They unblocked a project that had been stuck for two months. Permit closed on the next cycle.”
— Project Architect